CogninexaInnovations

Week 3 knew.Month-end found out.

Cost overruns leave clues on site weeks before they reach the books. Cogninexa Project Intelligence reads your site data and cost data together, every week, and tells you which projects need you first.

Built in Canada. Your data stays in Canada.

How an overrun builds up over eight weeks Weekly bars of cost drift. Small in weeks 1 and 2. From week 3 the bars rise as early signals appear, which Cogninexa flags. The overrun only shows up in the month-end report in week 8. W1W2W3W4 W5W6W7W8 Cogninexa flags it Report
Illustration: cost drift on a typical overrun, week by week.

Every overrun leaves clues

Site teams see the problem first. Finance usually finds out at month-end, when the cheap fixes are gone.

  1. Week 3An excavator is down “for a few hours”. Then again on Thursday.
  2. Week 4Concrete and rebar use creeps above plan. Nobody adds it up yet.
  3. Week 5Crews log more hours for the same progress, to keep the dates.
  4. Week 8The month-end cost report shows the overrun. Recovery now costs far more.

None of these readings looks alarming on its own. Together they are a project that needs attention. Cogninexa watches for exactly that pattern and puts a dollar figure and a recommended action next to it while there is still time to act.

Cogninexa Project Intelligence

A weekly health check for every project you run.

Five site signals, read alongside budget, spend and purchase orders. When several move together, you hear about it the same week.

Equipment utilization

Share of available machine hours actually worked. Idle machines still cost money, and the work that depends on them slows down.

Equipment downtime

Hours lost to breakdowns and repairs. Small stops add up fast, and they are usually the first clue.

Material used vs plan

Overuse shows up here weeks before the supplier invoice does.

Labour hours vs plan

More hours for the same progress is the most common way a schedule is kept and a budget is lost.

Machine vibration

Optional. Where a key machine has a sensor, rising vibration is an early warning before it breaks down.

What your team gets, for every project

Final cost forecast, with a range
The likely final cost and the gap to budget, always with a low-to-high range rather than one number.
Finish date and delay
How far behind the project is today, and the likely delay to the planned finish.
Risk score from 0 to 100
One number per project, split into cost, schedule, equipment, material and labour, so you can see what is driving it.
Early warnings
Weeks where a reading breaks the project's usual pattern, alone or in combination with others.
Site-to-cost impact
Each warning traced to an estimated delay and cost, with the assumption behind every step shown.
Recommended actions
An owner, the steps, a target and the estimated saving. Where there is no data to price a problem, it recommends an inspection instead of inventing a number.
What-if testing
Move a slider, such as restoring equipment availability, and the forecast, risk and schedule update instantly.
History and export
Results for every date are kept, so you can see how a forecast moved. Everything exports to Excel.

A weekly readout

What one project looks like in the dashboard.

SR-302

North Yard Storm Sewer

Week 6 of 40, 11% complete
86/100Critical
Forecast final cost$2.97M$573k over a $2.40M budget (+23.9%)Likely range $2.47M to $3.31M
Schedule4 days behindLikely 40 to 63 days late at finishIf nothing changes
Signals for this project, six weeks in
SignalWeek 1This week
Equipment utilization84%68%
Equipment downtime4%17%
Material used vs plan100%124%
Labour hours vs plan101%127%
Pump vibration2.4 mm/s6.8 mm/s
Top recommended action

Restore equipment availability. Assign the site superintendent, schedule the pump repair this week and line up a standby unit. Re-running the forecast with downtime back at 6% is what the estimated saving is based on.

Demo project with synthetic data, not client results.

How it works

No new hardware and no ERP project. You can start logging the same day.

  1. Add your projects

    Budget, start date and planned duration. About a minute each. The budget split and other details are optional.

  2. Log each working day

    Site staff fill in a two-minute form on their phone: progress, equipment, materials, labour and the day's costs. Office staff can type or paste a week at a time on a computer.

  3. Results update as you save

    Forecast, risk score, warnings and actions are recalculated the moment data is saved. A project joins the results once it has entries in four different weeks.

  4. Act, then test it first

    Pick a recommended action, try it with the what-if sliders, and watch the forecast move in the following weeks.

No spreadsheet required

Everything is entered straight into Cogninexa, by the people who see it happen. If your data already lives in Excel, it comes with you.

  • A phone form for site staff. Large fields, units shown, and one tap to copy yesterday's readings so only the changes need typing.
  • A table for the office. Enter or correct several days at once, or paste rows straight from Excel.
  • Your whole team can contribute. Every change is recorded with who made it and when.
  • Spreadsheets still welcome. Import a workbook once and carry on in the app, or keep sending a daily file automatically with Microsoft Power Automate.
SR-301 Riverside Retaining WallDaily log
‹Thu, Nov 12›
27.5%
81%
5%
103% of plan
Saved for Nov 12. Results updated.Moderate Risk 36, forecast $1.27M (+6.0%)

No black box

Methods your finance team can check.

MethodUsed forIn plain terms
Earned valueCost forecast from day oneThe project-controls standard: final cost is the budget divided by the cost performance index.
Ridge regression ensembleCost forecast once you have historyLearns from your own completed projects (30 or more). Shapley values show exactly what moved each forecast.
Robust z-scoreWarnings, one reading at a timeCompares each week with the median of the previous eight and flags readings far outside the usual spread.
Isolation ForestWarnings, readings in combinationTwo hundred decision trees catch weeks where several readings shift together, even when none is extreme alone.

Every figure says where it came from

Observed
Taken straight from your data.
Forecast
Calculated by a model, with a range.
Estimate
A reasoned figure, such as the cost of a delay.
Assumption
A setting you can see and change, such as cost per day of delay.

Alongside your ERP

Keep Oracle, QuickBooks or whatever you use today.

Your ERP tells you what you've spent. Cogninexa tells you what you're going to spend, why, and what to do about it.
Your ERPCogninexa
Main jobRecords what happenedPredicts what will happen
Looks atSpend to dateFinal cost and finish date
DataFinancial transactionsFinancial data and site data together
WarningsWhen overruns reach cost reportsWhen early signals appear on site
OutputLedgers, invoices, reportsForecasts, risks and actions

Cogninexa does no accounting or purchasing.

Your data stays yours

Hosted on Microsoft Azure, Canada Central.

Separate data for every client
Each company sees only its own projects. Cogninexa staff can't see them either without an invitation.
Roles
Admin, Analyst and Viewer control who can manage the team, change assumptions or only read.
Protected sign-in
Two-step verification, lockout after repeated failures, and a limit of two devices per user.
Full audit trail
Sign-ins, data changes, exports and access changes are recorded with who, when and from where.
Encrypted
Encrypted connections, and data stored in Canada.
Export or delete at any time
Download everything in one file, or permanently delete it, whenever you choose.

Still to come: an independent security audit (SOC 2), a penetration test, and single sign-on.

Ways to start

Start small, on your own data.

Managed analysis

Send us your project data and we deliver a reviewed report, once or every month. Nothing new for your team to learn.

Paid pilot

Six to eight weeks on one or two live projects, with your team logging the data. The fee is credited toward a subscription if you continue.

Subscription

The dashboard in your team's hands, priced per active project.

How a pilot runs

  1. Week 1Kick-off. We set up your projects with you and train the people who will log the data. Past weeks can be imported from your spreadsheets.
  2. Weeks 2 to 6Your team logs each working day. We review the results with you every week.
  3. Final weekA readout: what the forecasts said, what happened, and what it was worth. Then you decide.

Built for project-based businesses

  • Construction and infrastructure
  • Energy and solar
  • Manufacturing and fabrication
  • IT and ERP programs

Oracle Fusion consulting and talent

Screened by a senior practitioner.

We source and screen Oracle Fusion professionals for consulting firms, implementation partners and enterprises, from a network built over more than 20 years of delivery.

AreaModules and roles
FinancialsGL, AP, AR, Fixed Assets, Cash Management, Expenses, Tax
Supply chainOrder Management, Inventory, Procurement, WMS, GTM
ManufacturingManufacturing, Cost Management, Product Hub, Configurator
CX and CRMSales, Service, customer data model (TCA), CRM migration
TechnicalOIC, SOA, BIP, OTBI, extensions, data conversion
DeliveryProgram and project managers, architects, business analysts
Markets
Canada, India and the United States; onsite, hybrid or remote.
Hiring models
Sub-vendor partnership, contract, contract-to-hire and full-time.
Every submission includes
A formatted profile, skills summary, rate, notice period and availability.
Our process
Requirement intake, sourcing, screening and submission, then interviews through to joining.

About us

A small, senior-led Canadian company.

Cogninexa Innovations is run by its three co-founders from the Greater Toronto Area. Our edge is domain depth, not size: we have spent years on the projects and the ERP systems this product is built for.

  • Pankaj SharmaCo-founder. More than 20 years leading Oracle EBS and Fusion programs across finance, supply chain, manufacturing and CRM. Executive MBA and MSc in Data Science.
  • Aryan VashishthCo-founder
  • Aditya VashishthCo-founder

Where we are

Live now

  • Web app on Microsoft Azure in Canada, installable on phones and computers
  • Daily data entry in the app, on a phone or a computer
  • Automatic daily uploads through Microsoft Power Automate
  • Forecasts that learn from your own completed projects, once 30 are entered

Next

  • Android app on Google Play
  • Industry templates, starting with solar

Later

  • Live Oracle ERP connectors
  • Single sign-on and an independent security audit

Plans, not commitments: the order follows what our clients need most.

Questions we often get

Do we have to replace our ERP or change our processes?

No. Cogninexa sits alongside your ERP and does no accounting or purchasing. The only new habit is a two-minute daily log per project, or a daily file if you already keep one.

What data do we need to start?

For each project: the budget, start date and planned duration. Then, each working day, the project's % complete and whatever you track of equipment, materials, labour and costs. Purchase orders and completed past projects are optional and make the results sharper.

How soon do we see a forecast?

A project joins the results once it has entries in four different weeks. If you have earlier weeks in a spreadsheet, import them and you can see results on the first day.

Do site staff need training?

Very little. The daily form works in any phone browser, shows the unit next to each field, and can copy the previous day's readings so only the changes need typing.

Is it accurate?

Every forecast comes with a range, and every figure is labelled as observed, forecast, estimate or assumption. Until you have 30 completed projects of your own, cost forecasts use earned value, the method project controls teams already trust, and the dashboard says so.

Where is our data stored, and who can see it?

On Microsoft Azure in Canada. Only the people you invite can see your organization's data, and you can export or delete all of it at any time.

What does it cost?

Subscriptions are priced per active project. Pilots are a fixed fee that is credited toward a subscription. Get in touch and we'll quote for your portfolio.

Let's look at your projects together

Ask for a 20-minute demo on sample data, a pilot on your own projects, or help with Oracle Fusion hiring. We reply within two business days.

Cogninexa Innovations info@cogninexainnovations.com Greater Toronto Area, Ontario, Canada

We use your details only to reply to you. See our privacy notice.